TCB completed a multi-day engineering and execution review with an OEM partner to finalize procedures for upcoming hydro-mechanical work across multiple units. The collaborative sessions focused on planning, tooling, lift strategies, and execution sequencing.
Purpose of the Review
The review ensured:
- Alignment between field crews and engineering
- Validation of disassembly and reassembly procedures
- Confirmation of tooling, fixtures, and millwright methods
- Coordination for outage logistics and timeline constraints
Technical Topics Covered
The team reviewed:
- Turbine component removal and installation
- Rigging geometry and engineered lift points
- Specialized tooling requirements
- Safety controls for confined-space and high-energy systems
Outcome
The multi-day sessions produced final, executable procedures and reinforced a shared understanding of requirements ahead of the scheduled outage window.
Commitment to Precision Planning
Thorough pre-outage preparation remains essential to TCB’s approach, ensuring safe, predictable, and efficient execution once fieldwork begins.


