Replacing a Critical River Crossing
TCB Industrial completed the replacement and realignment of the Evergreen Road Bridge over the Middle Fork of the Tuolumne River. The project included excavation, formwork, construction of new bridge abutments, backfill and compaction, and installation of precast bridge sections.
Environmental and Regulatory Coordination
Work was performed under strict environmental controls addressing protected species and habitat restoration. Vegetation removal was completed by hand where required, and the riverbed was restored to its original condition prior to demobilization.
The project was reviewed by multiple state and regional agencies, requiring close coordination and compliance throughout construction.
Completion
Delivery logistics for precast bridge sections required detailed planning and spotter coordination due to limited site access. The bridge replacement was completed safely, on schedule, and in accordance with regulatory requirements.