TCB Conducts Multi-Day Technical Procedure Review with OEM Partner to Align Strategies for Upcoming Hydro-Mechanical Work

TCB completed a multi-day engineering and execution review with an OEM partner to finalize procedures for upcoming hydro-mechanical work across multiple units. The collaborative sessions focused on planning, tooling, lift strategies, and execution sequencing.

Purpose of the Review

The review ensured:

  • Alignment between field crews and engineering
  • Validation of disassembly and reassembly procedures
  • Confirmation of tooling, fixtures, and millwright methods
  • Coordination for outage logistics and timeline constraints

Technical Topics Covered

The team reviewed:

  • Turbine component removal and installation
  • Rigging geometry and engineered lift points
  • Specialized tooling requirements
  • Safety controls for confined-space and high-energy systems

Outcome

The multi-day sessions produced final, executable procedures and reinforced a shared understanding of requirements ahead of the scheduled outage window.

Commitment to Precision Planning

Thorough pre-outage preparation remains essential to TCB’s approach, ensuring safe, predictable, and efficient execution once fieldwork begins.